 | Larch Wood’s Nyle Kiln, manufactured in Maine USA, can dry up to 18,000 board feet at a time. We have been drying Larch for over 12 years and have developed our own schedule specific to larch. It generally takes 14 -16 days to dry a load. This can change due to the length of time the wood has been cut before kiln drying. Once loaded into the kiln we top off each stack of wood with a large slab of concrete which prevents twisting and cupping. When the process is finished we store the wood in a climate controlled space until it is ready to be milled for Cutting Boards or flooring. |
|